Chiltern Woodcraft

@chilternwoodcraft

Follow
248 posts1,847 followers312 following

Heritage building conservation & traditional joinery • The Chilterns, Buckinghamshire • Maximum retention, minimum intervention • Enquiries 👉 hello@chilternwoodcraft.co.uk

Visual feed

A record of careful work

Quick glimpses from the workshop and field. Tap any post for the full project story, location, and conservation details.

View full case studies
197 days ago

chilternwoodcraft Curved wall rebuild: sweeping brick elevation with salvaged stacks and the church beyond.

Wall Rebuild
197 days ago

chilternwoodcraft Historic curved boundary wall & brick pier framed against the Victorian church spire.

Masonry & Lime
197 days ago

chilternwoodcraft Panoramic alignment of the curved wall with cleaned footing bed ready for lime mortar rebuild.

Wall Restoration
197 days ago

chilternwoodcraft Extensive western red cedar root network extracted from beneath the curved wall footings.

Ground Remediation
1214 days ago

chilternwoodcraft Berkshire curved wall rebuild: historic brick stacks with the Victorian church rising behind.

Wall Rebuild
197 days ago

chilternwoodcraft Curved wall alignment and cedar stump excavation ready for lime mortar rebuild.

Wall Restoration
1214 days ago

chilternwoodcraft Curved boundary wall with rounded clay copings against the churchyard boundary.

Masonry & Lime
1214 days ago

chilternwoodcraft Cleaned masonry bed along the curved wall with salvaged rounded-top copings.

Masonry Bed Prep
197 days ago

chilternwoodcraft Western red cedar root mass extracted from beneath the historic wall footings.

Ground Remediation
1214 days ago

chilternwoodcraft Carefully dismantling displaced brickwork, salvaging and pallet-stacking historic bricks.

Wall Rebuild
1214 days ago

chilternwoodcraft Historic boundary wall beside churchyard: tree root damage surveyed along curved alignment.

Wall Rebuild
1214 days ago

chilternwoodcraft Dismantling damaged brickwork to solid bed in preparation for rebuilding with lime mortar.

Masonry & Lime
1351 days ago

chilternwoodcraft Gateway view: completed Cotswold binding gravel churchyard pathway in South Oxfordshire.

Groundwork
1351 days ago

chilternwoodcraft Churchyard path sweeping past medieval nave and knapped flint angle buttresses.

Groundwork
1351 days ago

chilternwoodcraft Avenue beneath ancient yew tree canopy — self-binding Cotswold gravel pathway.

Groundwork
1351 days ago

chilternwoodcraft Northern cemetery junction: flared Cotswold gravel path with timber edging.

Groundwork
Bosence Associates Heritage Surveyors
84 days ago

chilternwoodcraft Surveying historic Alms houses in Surrey with Bosence Associates — vernacular brickwork & ornate bargeboards.

Surveys & Advisory
1135 days ago

chilternwoodcraft Punching 2-metre aperture through flint wall & cutting 1960s concrete plinth.

Heritage Gates
1135 days ago

chilternwoodcraft Cutting out concrete barrier with disc cutter for Purdy Gates steel post footings.

Heritage Gates
1728 days ago

chilternwoodcraft Completed courtyard pedestrian gate with reclaimed brick columns & flint repairs.

Heritage Gates
1756 days ago

chilternwoodcraft Flint wall repairs on the Berkshire Downs — preserving the past for the future.

Flint, Brick & Stone
Hand-cleaved thatching spars — A grade hazel secured into a thatched ridge.
285 days ago

chilternwoodcraft Hand-cleaved thatching spars — A grade hazel secured into a thatched ridge.

Spar Making
3986 days ago

chilternwoodcraft End of season virgin hedge laid — tools oiled and rested for summer.

Hedge Laying
2742 days ago

chilternwoodcraft Grand opening of Kidmore End Well House — village celebration.

Community Heritage
2370 days ago

chilternwoodcraft Well House conservation complete — jacked, re-silled, re-roofed.

Timber Conservation
8105 days ago

chilternwoodcraft Lime mortar beds set, apotropaic marks discovered in the rafters.

Timber Conservation
15126 days ago

chilternwoodcraft Working over the 264ft well head in safety harness — sill plates & winding gear.

Timber Conservation
15126 days ago

chilternwoodcraft Phase one: new pegged oak sill frame laid out beside original decayed sills.

Timber Conservation
15126 days ago

chilternwoodcraft Sill plate frame pegged — saved from a 264ft drop into the well.

Traditional Joinery
31133 days ago

chilternwoodcraft Jacking begins on the 1860s Well House — air-dried oak sills.

Timber Conservation
24140 days ago

chilternwoodcraft Victorian Well House surveyed — protective fencing, phase one.

Timber Conservation
1214 days ago

chilternwoodcraft Curved wall rebuild begins — lime mortar, salvaged brick.

Wall Rebuild
197 days ago

chilternwoodcraft Western red cedar stump ground out before wall rebuild.

Wall Restoration
251 days ago

chilternwoodcraft River Lambourne bank restored — hazel faggots, membrane, re-turfed.

River Restoration
212 days ago

chilternwoodcraft Clunch wall rebuild and soft lime putty pointing complete.

Clunch Conservation
242 days ago

chilternwoodcraft Water-damaged clunch wall surveyed — soft lime putty repairs begin.

Heritage Surveys
93 days ago

chilternwoodcraft Sill plate detailing and damp-proofing best practice on historic timber.

Timber Framing
71 days ago

chilternwoodcraft Grade II internal limestone wall rebuilt — oak plinth for porcelain sink.

Heritage Masonry
71 days ago

chilternwoodcraft Victorian bridle holder restored with reclaimed oak pegs.

Traditional Joinery
172 days ago

chilternwoodcraft Flint wall opened — reclaimed brick columns and pedestrian gate.

Flint & Brick
113 days ago

chilternwoodcraft 1960s concrete plinth cut out — steel post prep for 200kg gate.

Groundwork
93 days ago

chilternwoodcraft Edwardian chimney lowered below roof line — lead valley renewed.

Roofline Masonry
184 days ago

chilternwoodcraft Great Haseley Church — green oak organ pedestal, wheelchair space.

Ecclesiastical
Churchyard wall conservation — knapped flint & lime repointing.
282 days ago

chilternwoodcraft Churchyard wall conservation — knapped flint & lime repointing.

Ecclesiastical
243 days ago

chilternwoodcraft Great Haseley Church floor — lime mortar bedding for organ plinth.

Ecclesiastical
93 days ago

chilternwoodcraft Jack rafter compound-angle joints on the oak frame roof.

Traditional Carpentry
104 days ago

chilternwoodcraft Vaulted French boxed heartwood oak roof — crash deck removed.

Oak Framing
104 days ago

chilternwoodcraft French boxed heartwood oak roof — ridge & king strut vault detailing.

Oak Framing
104 days ago

chilternwoodcraft French boxed heartwood oak framing with integrated twin rooflights.

Oak Framing
104 days ago

chilternwoodcraft French boxed heartwood oak roof — eaves purlin & reveal framing.

Oak Framing
104 days ago

chilternwoodcraft French boxed heartwood oak vaulted roof — wide view ready for kitchen fitters.

Oak Framing
104 days ago

chilternwoodcraft French boxed heartwood oak roof — hip & valley rafter intersection.

Oak Framing
74 days ago

chilternwoodcraft Cottage bathroom — lime scratch coat, oak plinth, Irish porcelain sink.

Lime Plaster
194 days ago

chilternwoodcraft Oak framed hipped roof — datum points, timber inspection, scribing.

Timber Framing
145 days ago

chilternwoodcraft Great Milton wall stabilised — NHL 3.5 coarse corn lime putty.

Stone Wall Conservation
166 days ago

chilternwoodcraft Historic wall stabilised — preservation over rebuild, lime putty.

Masonry Stabilisation
147 days ago

chilternwoodcraft 1960s cement cut out — lime mortar repointing, panel one.

Flint & Brick
208 days ago

chilternwoodcraft Vernacular barn courtyard — flintwork and lime pointing complete.

Vernacular Barn
179 days ago

chilternwoodcraft Internal and external lime mortar pointing complete.

Lime Mortar
1412 days ago

chilternwoodcraft 18th century rubble stone wall — scratching out and repointing.

Stone Conservation
1715 days ago

chilternwoodcraft Country house pillar rebuilt in lime mortar before new floor.

Masonry Reconstruction
3718 days ago

chilternwoodcraft Grade II barn — earth bank moved, retaining wall, French drain.

Barn Conservation
1810 days ago

chilternwoodcraft St Peter's Church, Brimpton — knapped flint angle buttress repair.

Church Conservation
1314 days ago

chilternwoodcraft Muddy churchyard path transformed — Cotswold binding gravel.

Churchyard
5620 days ago

chilternwoodcraft Billhooks and adze axes — Weald & Downland museum archive.

Traditional Tools
3225 days ago

chilternwoodcraft Collecting stakes and binders — sustainable coppicing.

Woodland
2630 days ago

chilternwoodcraft Hazel arch walkway rebuilt — drawknife bark peeling for longevity.

Garden Structures
1135 days ago

chilternwoodcraft Lime mortar wall base — rebuild and repoint with breathable mix.

Lime Mortar
Workshop ready for the new season — enquiries welcome.
3122 days ago

chilternwoodcraft Workshop ready for the new season — enquiries welcome.

Countryside Management
Bosence Associates Heritage Surveyors
84 days ago

chilternwoodcraft Heritage in partnership with modern: industrial conversion survey in central London in collaboration with Bosence Associates.

Surveys & Advisory

Follow the work as it happens

We share project updates, workshop notes and before-and-after restoration work on Instagram. Full case studies live on our Projects page.

Chat on WhatsApp