Phase 1: Aperture Cleaned & Courtyard Access Opened
It's been a joy to work with the client on this job in South Oxfordshire. We started by punching a hole through the flint wall and cutting the 1960s concrete plinth, followed by the installation of the steel hanging post. Brick columns were then built using reclaimed hand made bricks to match the existing brick work with sympathetic flint and lime mortar repairs to match. Now the courtyard can be accessed via the new/ reclaimed pedestrian gate.
Stage three: cleaning back the ragged flint jambs, sorting and stockpiling sound flint for re-use, and establishing clear line and level through the aperture into the historic vernacular barn complex behind.
South Oxfordshire