Work has started on our latest project, building an oak framed roof with hipped end. First task was to establish a datum point where all measurements can be taken from, then squaring and levelling wall plates. Finally we were ready to inspect the air dried timbers delivered for quality (particularly inspecting the fissures for their length/size). Tie beam, Ridge beam and King post are now laid out on the crash floor in their correct orientation ready for scribing and cutting.
A comprehensive traditional oak framed roof project featuring a hipped end. Initial works involved establishing datum lines for full geometric accuracy, squaring and levelling all perimeter wall plates, and rigorous quality inspection of air-dried structural oak members. The tie beam, ridge beam, and king post were positioned on the crash floor for traditional scribe-rule joinery layout before joint cutting.